Documents and information
The documents and information regulations 4 and 12 and Schedule 1 require: competence declaration, construction and change control plans, MOR plan, compliance statement, fire and emergency file and plans.
Free Gateway 2 pre-submission check
Gateproof screens a building control approval application for a higher-risk building against SI 2023/909 and the BSR's guidance, before you submit.
Drop the application folder here
PDF, DOCX or TXT, a whole folder is fine
The documents and information regulations 4 and 12 and Schedule 1 require: competence declaration, construction and change control plans, MOR plan, compliance statement, fire and emergency file and plans.
Phrases that defer the design, such as "to be confirmed", "at a later stage" and "it is anticipated that".
Storey counts per building against the elevations, heights, unit numbers, and drawing revisions in file names against title blocks.
Every drawing's number, revision and last issue, read from the title blocks, including drawings still issued "for planning".
Real output on a public planning set (Manor Road, Richmond, GLA479503). It's a planning set, not a Gateway 2 pack, so the Gateway 2 documents are correctly reported missing.
Yes. Files are read and checked inside this web page, using open-source code (pdf.js and Pyodide) served from this site. Nothing is uploaded, and the page's security policy blocks it from contacting any other site. Once the page has loaded you can disconnect from the internet and it keeps working (keep the tab open).
An automated screening aid. It is not a fire engineering, structural or design review, not a compliance opinion and not an approval. It works from the text in your documents, so scanned drawings without a text layer can't be read. A clean result does not mean the application is complete, valid or compliant. The client and dutyholders remain responsible for the application.
It checks against the regulations and the BSR's guidance "Preparing information for a building control approval application" as published at the time of writing. Rules and guidance change, so always check the current versions on GOV.UK.
We're considering a paid, in-depth review of the Schedule 1 content (control plans, compliance statement element by element, fire and emergency file). If you'd use one, email gateproof@protonmail.com with roughly how many applications you prepare a year. No documents, please.
Tell us, without attaching documents: gateproof@protonmail.com.